A sponsor with several studies reaching database lock at once needed programmers who could work inside its own systems and standards, without a long ramp-up.
The challenge
The sponsor's in-house team was sized for steady work, but several studies were heading for database lock in the same quarter. Hiring permanent staff for a peak did not make sense, and earlier contractors had needed weeks to learn the sponsor's macro library and standards.
What we did
We set up a functional service provision team working directly in the sponsor's SAS environment, to its programming standards and review process. A lead programmer spent the first week with the sponsor's team learning the standard macros, then wrote a short onboarding guide so further team members could start productively within days. Work was planned study by study with the sponsor's leads, and our programmers handled SDTM, ADaM and TLF production and validation.
The result
The studies reached their reporting milestones as planned, and the sponsor kept the team on to support the next wave of studies, scaling it up and down as the pipeline changed.